1、Project: The Resort at Mandarin Oriental Hotel.
2、Principal: Mandarin Oriental Hotel, Macau.
3、Construction time: 1998-12 To 1999-10.
4、Supervision: P&T Architect and Engineer, Macau.
5、Contract Sum): 60 million partacas.
Presentation:
Located at the seashore of the New Harbour Reclamation Area, the resort is connected to the existing hotel, and Resort occupied a total area of 15,000 sq. meters. It comprised a distinctive swimming pool with a waterfall featured of artificial rocks, a row of 1-storey high clubhouse housing a health club with full facilities, a restaurant, a landscaped garden with tennis and multi-purpose courts as well as a carpark. The Resort was designed in a Mediterranean style with rich Asian and Macaunese features.