CEM Power Sub-station in Taipa
[ Published: 3/20/1995 5:35:41 PM ] [ Read: 141 ]

1Project: CEM Power Sub-station in Taipa

2Principal: Macau Electricity Company

3Construction time: 1995 To 1996.

4Supervision:

5Contract Sum): 14 million patacas.

Presentation:

  With a 12 meters high headroom on the ground floor, this sub-station was built to house high voltage electrical transformers and distribution equipment. The work included all civil works, general building E&M systems, deep cable trenches and related specialized ancillary facilities.
  


CEM Power Sub-station in Taipa

Phone:(853)28522522    Fax:(853)28561950    E-Mail:tongleil@macau.ctm.net
Add:Rua De Ferreira do Amaral No.13C-D,R/C(Edif.Iau Luen) Macau.
Tong Lei Engineering & Construction Co.Ltd 2006-2010 © Copyright