1、Project: CEM Power Sub-station in Taipa
2、Principal: Macau Electricity Company
3、Construction time: 1995 To 1996.
4、Supervision:
5、Contract Sum): 14 million patacas.
Presentation:
With a 12 meters high headroom on the ground floor, this sub-station was built to house high voltage electrical transformers and distribution equipment. The work included all civil works, general building E&M systems, deep cable trenches and related specialized ancillary facilities.
CEM Power Sub-station in Taipa
|