1、Project: Viaduct in Tamaguim Barbosa.
2、Principal: Macau Government – Public Works Department
3、Construction time): 1995 To 1995.
4、Supervision: CPI Consultant Firm
5、Contract Sum: 15 million patacas.
Presentation:
This was a design and build, turnkey contract. The viaduct has a total length of 700 meters and allows for two lane traffic. In order to avoid mass relocation of underground piping networks, a flexible foundation design was employed to suit existing underground obstacles found during the progress of work and thus saved a lot of time and money.
Viaduct in Tamaguim Barbosa
Viaduct in Tamaguim Barbosa
|